Satellite building – Athens International Airport

Satellite building – Athens International Airport

Contractor: AKTOR

Project Budget: 160.000,00 €

Duration of Construction: 3 months

Construction Year: 2018

Project Description

Electrical works construction for the extension of existing installations at Satellite building of Athens International Airport with the following detailed works:

  • Installation works in order to provide the electric power supply of the building lighting, the power sockets ,ventilation and the air conditioning equipment’s
  • Installation works in order to provide electric power of electric panel (Normal power – UPS power – HZ power)
  • Installation and connection works of local electrical panels
  • Supply and installations works of the low voltage cablings for specific security and protection systems (fire detection– access control-CCTV-public address )
  • Supply, installation, termination and certification of building structured cabling in order to create a new data network using cooper and fiber optic cables.
  • Supply and installations works of the cablings infrastructure using metal cable tray , plastic cable trucking , pipes etc
  • Installations works of the monitors flights information
  • Installation and commissioning works of new systems
  • As Built Drawing and measurements according to HD 384