Supply and Construction of the new power feeder cables Medium Voltage on Network 20kv in order to provide the power supply at the complex of buildings in Tripoli΄s Industrial Area, with the following detailed works:
Electrical works for the construction of underground Medium Voltage cabling infrastructure (piping – manholes etc)
Electrical works for the construction of Medium Voltage 20kv cables
Connecting the cables in a new Medium Voltage panels
Commissioning of the new installation
As Built Drawing and measurements according to HD 384