Hellenic Electricity Distribution Network Operator Building
Hellenic Electricity Distribution Network Operator Building
Contractor: EFC
Project Budget: 70.000,00 €
Duration of Construction: 5 months
Construction Year: 2023 -2024
Project Description
Installation works of new structured cabling in office building at Athens city according to following details services description:
Installation works of new horizontal structured cabling in order to provide a data/voice connection of the work stations at each building floor
Installation works of new horizontal structured cabling in order to provide data connection of the wireless network (AP΄S) at each building floor
Installation works of new back bone structured cabling in order to provide data connection of the local rack at each building floor to the main rack using fiber optic cabling
Termination and labeling of new data cabling
Installation and connection of new wireless data point equipment