New TAXI parking area & Everest fast food store at Athens International Airport
New TAXI parking area & Everest fast food store at Athens International Airport
Contractor: AGT SA
Project Budget: 200.000,00 €
Duration of Construction: 6 months
Construction Year: 2023
Project Description
Electrical works installations at the taxi vehicles parking area and new Electrical works installations of the Everest fast food store with the following detailed works:
Installation works in order to provide the electric power supply of the indoor and outdoor lighting, the power sockets ,ventilation and the air conditioning equipment’s
Installation works in order to provide electric power of electric panel (Normal power – UPS power – HZ power)
Installation and connection works of local electrical panels
Supply and installations works of the low voltage cablings for specific security and protection systems (fire detection – alarm system – access control-CCTV-public address )
Supply and installations works of the cablings infrastructure using metal cable tray , plastic cable trucking , pipes etc
Supply and installations works of the underground cablings infrastructure using heavy type piping.
Supply, installation, termination and certification of building structured cabling in order to create a new data network using cooper and fiber optic cables.
Supply and installations works of the low voltage cablings for the new taxi priority system.
Installation and commissioning works of new systems
As Built Drawing and measurements according to HD 384