datacenter

Construction of electrical installation building works of UNIC

Construction of electrical installation building works of UNIC

Budget: 710.000,00€

Duration of construction: 5 months

Year of construction: 2025    

Construction of the building electrical installation works which are began in fall 2025 at the 12,500-square-metre facility adjacent to The Ellinikon development and consist of following works     

  • Electrical power feeder cabling in order to provide power consumption to lighting – power sockets and air-conditioning system of the building.
  • Electrical power feeder cabling in order to provide power consumption to new switchboard panels of specific building levels
  • Installation and connection works to new switchboard panels of specific building levels
  • Installation cabling works of the building fire detector system
  • Installation cabling works and the connection of the building BMS equipment
  • Installation cabling works and the connection of the building CCTV  equipment
  • Installation of structure cabling works (cooper and fiber optic) and the connection of the IT&T  equipment
  • Installation , connection and activation of light fixture equipment
  • Testing and commissioning of the entire new cabling installation works
  • As building drawings and testing according to HD384 standard.

Project Info

test