datacenter

MTB BLD – Athens International Airport

MTB BLD – Athens International Airport

Contractor: AKTOR SA

Project Budget: 1.300.000,00 €

Duration of Construction: 11 months

Construction Year: 2020-2021

Project Description

Construction of new electrical installations works at five (5) independent levels (8.000sqm) in BLD SWE of Athens International Airport area, with the following detailed works:

  • Installation works in order to provide the electric power supply of the building lighting, the power sockets ,ventilation and the air conditioning equipment’s
  • Installation and connection cabling works in order to make the building lighting control with the new KNX and DMX systems for the indoor and outdoor lighting system.
  • Electrical works for the construction of Medium Voltage Substation
  • Supply and installations works of the low voltage cablings for specific security and protection systems (fire detection – alarm system – access control-cctv)
  • Supply , installation, termination and certification of building structured cabling in order to create a new data network
  • Supply and installation of IT cabinets (racks 19’’)
  • Installation and connection works of cabling and equipment for BMS System operation
  • Installation and connection works of cabling and equipment for fire alarm System operation
  • Installation works in order to provide electric power of electric panel (Normal power – UPS power – HZ power)
  • Installation and connection works of local electrical panels
  • Installation and connection works of Main Low Voltage Panel
  • Supply and installations works of the cablings infrastructure using metal cable tray , plastic cable trucking , pipes etc
  • Supply and installations works of the cabling fire block outs
  • Installation and commissioning works of new systems
  • As Built Drawing and measurements according to HD 384