Contractor: CABLETEC

Project Budget: 130.000,00 €

Duration of Construction:  5 months

Construction Year:  2024

Project Description

Renovation of electrical installations at 5th floor new office building in N.Ionia,  Attikis, with the following detailed works:

  • Installation works in order to provide the power supply (Normal Power and UPS Power) of work stations
  • Installation works in order to provide the power supply of lighting equipment
  • Installation works in order to provide the power supply of air conditioning and ventilation equipment
  • Planning, supply and installation of new UPS electric panels.
  • Supply and installation of new LED lighting fixtures (panel –led strip etc).
  • Installation of structured cabling in order to provide data/voice network of work stations
  • Planning, supply and installation of new security and protection wirings at the entire building.(fire alarm – alarm – access control-CCTV)
  • Planning, supply and installation of new fire alarm equipment
  • Planning, supply and installation of new alarm equipment
  • Planning, supply and installation of new access control equipment
  • Planning, supply and installation of new CCTV equipment
  • Commissioning and programming of all the new systems
  • As Built Drawing and measurements according to HD 384