Contractor: CABLETEC Project Budget: 650.000,00€ Duration of Construction: 13 months Construction Year: 2023 -2024
Project Description Construction of electrical installations facilities in new building at the Tripoli΄s Industrial Area, with the following detailed works :
• Installation works in order to provide the power supply of mechanical production line equipment, lighting equipment and power sockets • Installation works in order to provide the power supply of laboratory equipment (Normal power sockets – UPS power sockets – air conditioning equipment – ventilation equipment) • Supply and Installation works of electric panels • Installation and connection of building BMS cabling • Installation works in order to provide the power supply at ΄΄clean rooms΄΄ departments • Supply and installations works of the low voltage cablings for the specific systems (fire detection – alarm system – access control – cctv – interlock-public address ) • Supply, Installations and activation works of the specific systems (fire detection – cctv – public address) • Supply and Installation of the gas detection system equipment • Installation works of new horizontal structured cabling in order to provide data connection of building work stations • As Built Drawing and measurements according to HD 384